Monitor risk by treating a process window change as a controlled change, not just a parameter update. Increase observation around the moved limits, verify measurement capability, watch leading indicators such as drift, rework, alarms, and operator overrides, and compare performance by product, tool, shift, and supplier lot. The right controls depend on data quality, process maturity, and how well your MES, QMS, SPC, and historian systems are integrated.