PARTS TRACEABILITY SOLUTIONS

FULL TRACEABILITY.
ZERO GUESSWORK.

Every aerospace part has a build story. Connect981 captures it automatically, linking every serial, lot, and inspection from raw material to final assembly.

WHY CONNECT981

Trace every part.
Contain defects faster.

01
Close the gaps in your trace data
Capture part, process, and supplier data automatically from receipt to final inspection.
02
Contain defects before they escape
Surface deviations early and find every affected part in hours, not weeks.
03
Hold suppliers accountable
Link every lot to its supplier with a verified chain of custody.
RECALL READINESS

Find every affected part in hours

Supplier lots, inspection results, and maintenance records live on one digital thread. When a recall hits, trace every affected part and where it went without opening a spreadsheet.

Turn traceability requirements into
a living digital thread

For teams working under AS9100 traceability requirements, FAA production rules, and customer flow-downs, every part must be traceable from source to delivery.

Traceability responsibility
How Connect981 makes it easier
Verify personnel qualifications
Verify operator certifications before work starts.

Identify every part, serial, and lot

Tag each item with a verified digital trace ID at receipt.

Maintain supplier chain of custody

Link every lot to its supplier, certifications, and receiving inspection.

Record each process and inspection step

Capture operations and inspection results against the part's record automatically.

Contain defects and recalls

Trace affected parts across work orders and sites in hours.

Provide traceability evidence

Export complete audit trails in one click.

For aerospace manufacturers that need better traceability

Built for production and MRO teams working under AS9100 and FAA requirements whose part history still lives in spreadsheets, paper travelers, and disconnected systems. Deploys in days, not months.

One digital thread
from supplier to shipment

As programs, suppliers, and sites multiply, trace data has to stay complete at every handoff. Manufacturers gain one record per part that every team can trust.

Capture without extra admin

Operators scan and log as they work. No missed steps.

See the full build story

Supervisors view every part's history in one place.

Connect your systems

Works alongside your ERP, MES, and PLM. No rip-and-replace.

Demonstrated improvements in
recall response

A major MRO network needed to trace every part affected by a supplier recall, across sites and years of records.

Major MRO network
every affected part traced in hours, not weeks.
30%
Fewer claims
Related to component and lot traceability discrepancies.

90%

Faster containment

Defect containment time reduced.

Hours

Not weeks

To trace every part in a supplier recall.

0

Lost records

During audit season.

Frequently asked questions

Answer

Does Connect981 replace our ERP, MES, or PLM?

No. Connect981 is an execution layer that sits on top of your existing systems. It integrates with ERP, MES, and PLM so every system shares the same part record.

How long does implementation take?

Most teams deploy in days, not months. Expert solutions are configured with a no-code builder, so quality and operations teams can set them up without IT projects.

Which requirements does it support?

Connect981 supports AS9100, FAA, EASA, and customer-specific traceability requirements, with serial, lot, and supplier data verified at every step.

What results have customers seen?

A major MRO network traced every part affected by a supplier recall in hours instead of weeks. They saw 90% faster defect containment and zero lost records during audit season.

Does it add work for operators?

No. Operators scan and log as part of the job, and data is captured automatically from receipt to final inspection.

Can it trace parts across suppliers and sites?

Yes. Supplier lots, inspection results, and maintenance records connect in one system across every site and supplier.