You should be very strict. In most regulated manufacturing environments, approved work instructions are part of the controlled method of execution. Schedule pressure may explain why people want to deviate, but it does not make uncontrolled deviation acceptable.
If an instruction is unclear, outdated, or impossible to follow as written, the right response is not to ignore it. The right response is to stop, escalate, and use the approved path for clarification, temporary deviation, concession, or revision, depending on your quality system and the nature of the issue.
Strict enforcement does not mean pretending every instruction is perfect. It means:
That is a different standard from rigidly pushing bad instructions. If the approved instruction is wrong, management owns the correction path.
Under schedule pressure, teams often assume the risk is limited to one job or one shift. In practice, the larger risks are cumulative:
Those risks can exceed the short-term benefit of pushing work through. This is especially true where product acceptance, repair history, process qualification, or as-built records matter.
Flexibility is reasonable in how fast you resolve the problem, not in whether the control exists. The practical question is whether you have a usable mechanism for urgent cases. Mature organizations usually need some combination of:
If those mechanisms are slow or unclear, people will work around them. That is a process design problem, not proof that instruction control is unnecessary.
In mixed environments, enforcement is harder than policy suggests. Plants often have paper packets, shared drives, MES prompts, ERP travelers, legacy document control tools, and tribal knowledge all active at once. In that situation, strict enforcement depends less on writing another rule and more on whether the approved version is actually accessible, current, and connected to execution.
If operators must check one system for the traveler, another for drawings, and a third for the latest instruction revision, errors are predictable. Full replacement of every legacy system is often unrealistic in regulated, long-lifecycle operations because qualification burden, validation cost, downtime risk, and integration complexity are high. In many plants, the safer approach is phased control improvement: tighten document governance, improve point-of-use access, log acknowledgments, and connect evidence trails across existing systems.
A workable standard is usually:
If schedule pressure repeatedly drives instruction bypass, the underlying issue is rarely operator discipline alone. It is often one or more of these: poor instruction quality, slow approval cycles, weak change control, disconnected systems, or unrealistic production planning.
So the short answer is yes, be strict about enforcement. But also be equally strict about making the approved path fast enough, usable enough, and traceable enough that people can comply under real production conditions.